Project Description
- Site Work: Soil remediation of contaminated soils; Connections to existing site Services; Relocation of Site Access; New paved parking lot; Infrastructure for future EV Car Charing Stations; New plaza and winding pathway (unit pavers); New concrete walkways (flat and sloped); Construction of a Fire Circle and associated Canopy, an Outdoor Classroom, and a Children’s Play Area; Construction of a Storage Shed; Construction of Terraced Planting Beds; Perimeter and Interior Fencing; Site Lighting; New Trees and naturalized landscape areas; and Site Signage.
- Building Addition: Demolition of an existing CMU addition and construction of a new timber framed addition.
- Photovoltaic Panels: New solar panels on addition roof and Fire Circle canopy.
- Masonry Restoration: Heritage masonry restoration of Kingston Limestone to address structural failures, cracking and delamination, required foundation repairs, required repointing; and mitigation of water and moisture infiltration. Cleaning of heritage masonry.
- Heritage Building Envelope Insultation: Introduction of insultation at heritage mass masonry walls, addition of insulation to heritage roof assembly at attic floor level.
- Heritage Window Rehabilitation: Removal of aluminum storm windows (exterior); Removal of wood sull sashes (interior); Rehabilitation of heritage wood windows including required glazing repairs and repainting; New high performance Passive House rated interior sull-sashes.
- Heritage Door Rehabilitation: Rehabilitation of exterior wood doors including wood repairs, glazing repairs, and repainting.
- Abatement of Hazardous Substances: Abatement of asbestos in perimeter gypsum walls; Removal of lead paint on wood windows. Refer to Revised Designated Substances Report in RFP for all elements containing hazardous
substances. - Interiors: Demolition and replacement of all interior finishes, fixtures, equipment, and Mechanical and Electrical systems; Demolition and reconstruction of interior stair; and New LULA Elevator.
Please send all questions to estimating@frecon.ca
Trades
- Division 02 - Exisiting Conditions
- Demolition
- Hazardous Material Removal
- Division 03 - Concrete
- Concrete Finishing
- Concrete Forming & Accessories
- Concrete Reinforcing
- Division 04 - Masonry
- Masonry
- Division 05 - Metals
- Metal Fabrications
- Structural Steel
- Division 06 - Wood, Plastics, Composites
- Architectural Woodwork
- Wood Framing
- Wood Trusses
- Division 07 - Thermal & Moisture Protection
- Dampproofing & Waterproofing
- Fire stopping
- Membrane Roofing
- Metal Siding & Roofing
- Shingles
- Spray on Insulation
- Division 08 - Openings
- Aluminum Windows, Curtain Wall, Entrances
- Doors and Frames
- Hardware
- Operators
- PVC Windows
- Wood Doors
- Division 09 - Finishes
- Drywall
- Flooring
- Painting & Wallcoverings
- Division 12 - Furnishings
- Roller Shades
- Division 14 - Conveying Equipment
- Lifts
- Division 21 - Fire Suppression
- Fire Suppression
- Division 22 - Plumbing
- Plumbing
- Division 23 - HVAC
- HVAC
- Division 26 - Electrical
- Electrical
- Division 27 - Comms
- Comms
- Division 28 - Electronic Safety and Security
- Electronic Safety and Security
- Division 31 - Earthwork
- Earthwork
- Division 32 - Exterior Improvments
- Fencing
- Landscaping
- Paving & Curbs
- Site Furnishings
- Division 33 - Utilities
- Utilities