UCDSB – Duncan J Schoular PS HVAC & Building Renovations
Smith Falls, On
- Closing Date: March 10, 2026, 03:00PM
- Architect: N45
- How to Close: estimating@frecon.ca
- Addendums: 2
Project Description
The project includes the following scope:
• HVAC upgrade, Air conditioning, Solar array, Windows, Library & classroom renovations and hydro service upgrade.
*The owner has prequalified Low-Voltage Cabling, Roofing, Aluminum Windows, Electrical and Mechanical.
Schedule
Completion: August 25, 2027.
Trades
- Division 01 - General Conditions
- General Conditions
- Division 02 - Exisiting Conditions
- Demolition
- Division 05 - Metals
- Structural Steel
- Division 06 - Wood, Plastics, Composites
- Architectural Woodwork
- Division 08 - Openings
- Aluminum Windows, Curtain Wall, Entrances
- Doors and Frames
- Operators
- Division 09 - Finishes
- Drywall
- Flooring
- Painting & Wallcoverings
- Division 10 - Specialties
- Chalk & Tack
- Division 12 - Furnishings
- Roller Shades
- Division 31 - Earthwork
- Earthwork