TOH – TCU Renovations

Ottawa, On

  • Closing Date: June 17, 2025, 03:00PM
  • Architect: HDR
  • How to Close: estimating@frecon.ca
  • Addendums: 2

Project Description

Fit up to existing 6-storey residential building and Mechanical/ Electrical upgrades.

Please be advised the following scopes of work are prequalified:

  1. ELECTRICAL
  2. PLUMBING
  3. HVAC

The following scopes are assigned contracts per 01 20 00:

  1. Data Cabling
  2. Security
  3. Patient Lifts
  4. Controls

Please send all questions to estimating@frecon.ca

Trades

    • Division 02 - Exisiting Conditions
      • Demolition
      • Hazardous Material Removal
    • Division 05 - Metals
      • Metal Fabrications
    • Division 06 - Wood, Plastics, Composites
      • Architectural Woodwork
    • Division 07 - Thermal & Moisture Protection
      • Caulking
      • Fire stopping
    • Division 08 - Openings
      • Aluminum Windows, Curtain Wall, Entrances
      • Doors and Frames
      • Hardware
      • Operators
      • Wood Doors
    • Division 09 - Finishes
      • Drywall
      • Epoxy
      • Flooring
      • Painting & Wallcoverings
      • Terrazzo
    • Division 10 - Specialties
      • WA
      • Window Film
    • Division 12 - Furnishings
      • Roller Shades
    • Division 21 - Fire Suppression
      • Fire Suppression