DCC – Construct 427 Mission Support Bldg
Petawawa, ON
- Closing Date: July 31, 2025, 02:00PM
- Architect: Republic
- How to Close: please email to estimating@frecon.ca
Project Description
The Work of this Contract comprises the construction of a new building approximately 613 square metres to accommodate unit personnel that includes lockers, washrooms and showers, and equipment storage and a Pole Barn (508m2). The sitework includes heavy duty asphalt pavement to building surrounds and access road.
Please forward any questions to estimating@frecon.ca
Trades
- Division 01 - General Conditions
- General Conditions
- Division 03 - Concrete
- Concrete Finishing
- Concrete Forming & Accessories
- Concrete Reinforcing
- Division 05 - Metals
- Metal Fabrications
- Structural Steel
- Division 07 - Thermal & Moisture Protection
- Dampproofing & Waterproofing
- Membrane Roofing
- Metal Siding & Roofing
- Division 08 - Openings
- Aluminum Windows, Curtain Wall, Entrances
- Doors and Frames
- Division 09 - Finishes
- Drywall
- Epoxy
- Flooring
- Painting & Wallcoverings
- Division 10 - Specialties
- Signs
- WA
- Division 21 - Fire Suppression
- Fire Suppression
- Division 22 - Plumbing
- Plumbing
- Division 23 - HVAC
- HVAC
- Division 26 - Electrical
- Electrical
- Division 31 - Earthwork
- Earthwork
- Division 32 - Exterior Improvments
- Paving & Curbs