DCC – Construct 427 Mission Support Bldg

Petawawa, ON

  • Closing Date: July 31, 2025, 02:00PM
  • Architect: Republic
  • How to Close: please email to estimating@frecon.ca

Project Description

The Work of this Contract comprises the construction of a new building approximately 613 square metres to accommodate unit personnel that includes lockers, washrooms and showers, and equipment storage and a Pole Barn (508m2).  The sitework includes heavy duty asphalt pavement to building surrounds and access road.

Please forward any questions to estimating@frecon.ca

Trades

    • Division 01 - General Conditions
      • General Conditions
    • Division 03 - Concrete
      • Concrete Finishing
      • Concrete Forming & Accessories
      • Concrete Reinforcing
    • Division 05 - Metals
      • Metal Fabrications
      • Structural Steel
    • Division 07 - Thermal & Moisture Protection
      • Dampproofing & Waterproofing
      • Membrane Roofing
      • Metal Siding & Roofing
    • Division 08 - Openings
      • Aluminum Windows, Curtain Wall, Entrances
      • Doors and Frames
    • Division 09 - Finishes
      • Drywall
      • Epoxy
      • Flooring
      • Painting & Wallcoverings
    • Division 10 - Specialties
      • Signs
      • WA
    • Division 21 - Fire Suppression
      • Fire Suppression
    • Division 22 - Plumbing
      • Plumbing
    • Division 23 - HVAC
      • HVAC
    • Division 26 - Electrical
      • Electrical
    • Division 31 - Earthwork
      • Earthwork
    • Division 32 - Exterior Improvments
      • Paving & Curbs