RCDSB – Opeongo High School Washroom Renovation
Douglas, ON
- Closing Date: June 29, 2026, 02:00PM
- Architect: Hobin Architecture
- How to Close: Please email all quotes or questions to: estimating@frecon.ca
Project Description
Scope Of Work:
This project involves the demolition of the Girls Washroom 1007, Pipechase 1008A and Boys Washroom 1008 to create a Unisex Washroom open to the Corridor with full height privacy toilet partitions. Additionally, there will be a small exhaust-vent to tie into the existing roof system.
Location:
1990 Cobden Road, Douglas, Ontario K0J 1S0
Scheduled Dates:
Start Date: June 29, 2026
Completion Date: August 21, 2026
Trades
- Division 01 - General Conditions
- General Conditions
- Division 02 - Exisiting Conditions
- Demolition
- Hazardous Material Removal
- Division 03 - Concrete
- Concrete Finishing
- Concrete Reinforcing
- Division 04 - Masonry
- Masonry
- Division 05 - Metals
- Metal Fabrications
- Structural Steel
- Division 06 - Wood, Plastics, Composites
- Architectural Woodwork
- Division 07 - Thermal & Moisture Protection
- Membrane Roofing
- Division 09 - Finishes
- Drywall
- Flooring
- Painting & Wallcoverings
- Division 10 - Specialties
- Toilet Partitions
- WA
- Division 22 - Plumbing
- Plumbing
- Division 23 - HVAC
- HVAC
- Division 26 - Electrical
- Electrical