Queens University – Etherington Hall Roof, Fire Alarm and Electrical Upgrade

Kingston, ON

  • Closing Date: December 10, 2026, 03:00PM
  • Architect: J.L Richards
  • How to Close: Please email all quotes or questions to: estimating@frecon.ca

Project Description

Scope Of Work:

This project primarily involves the replacement and improvement of the electrical and fire alarm systems in the Etherington Hall at Queens University. This includes the replacement of electrical building service equipment primarily limited to the main electrical room, replacement of the fire alarm system, replacement of high voltage feeders from Botterell Hall and the Stuart Street Underground Parking Garage, removal all existing roofing on the main roof, Re-roofing with associated new parapets / curbs, and removal and reinstallation of all rooftop equipment.

 

Location:

94 Stuart St, Kingston, ON K7L 2V6

 

Scheduled Dates:

Start Date: January 2027

Completion Date: May 2028

 

Trades

    • Division 01 - General Conditions
      • General Conditions
    • Division 02 - Exisiting Conditions
      • Demolition
      • Hazardous Material Removal
    • Division 04 - Masonry
      • Masonry
    • Division 05 - Metals
      • Metal Fabrications
      • Structural Steel
    • Division 07 - Thermal & Moisture Protection
      • Membrane Roofing
    • Division 08 - Openings
      • Aluminum Windows, Curtain Wall, Entrances
      • Doors and Frames
      • Hardware
      • Wood Doors
    • Division 09 - Finishes
      • Drywall
      • Painting & Wallcoverings
    • Division 22 - Plumbing
      • Plumbing
    • Division 23 - HVAC
      • HVAC
    • Division 26 - Electrical
      • Electrical