CECCE – Au Coeur d’Ottawa Fit-Up
Ottawa, On
- Closing Date: September 10, 2025, 02:00PM
- Architect: Hobin
- How to Close: estimating@frecon.ca
- Addendums: 1
Project Description
The current scope of the work is to renovate the ground, 2nd and 3rd floors. Floors 1 to 3 will be a change of use to assembly occupancies (community centre and public school, while floors 4 and 5 will be a future fit-up. The school fit-up includes approx. 50,000 sq.ft.
Schedule
Start date of construction: October 13th, 2025
Full Occupancy for the work shall occur by November 30th 2026.
Trades
- Division 01 - General Conditions
- General Conditions
- Division 02 - Exisiting Conditions
- Demolition
- Hazardous Material Removal
- Division 03 - Concrete
- Concrete Finishing
- Concrete Forming & Accessories
- Concrete Reinforcing
- Division 04 - Masonry
- Masonry
- Division 05 - Metals
- Structural Steel
- Division 07 - Thermal & Moisture Protection
- Dampproofing & Waterproofing
- Fire Proofing
- Membrane Roofing
- Metal Siding & Roofing
- Roof Anchors
- Spray on Insulation
- Division 08 - Openings
- Aluminum Windows, Curtain Wall, Entrances
- Doors and Frames
- Operators
- Division 09 - Finishes
- Drywall
- Epoxy
- Flooring
- Painting & Wallcoverings
- Division 10 - Specialties
- Chalk & Tack
- Toilet Partitions
- WA
- Division 14 - Conveying Equipment
- Elevators
- Division 21 - Fire Suppression
- Fire Suppression
- Division 22 - Plumbing
- Plumbing
- Division 23 - HVAC
- HVAC
- Division 26 - Electrical
- Electrical
- Division 27 - Comms
- Comms
- Division 31 - Earthwork
- Earthwork