CECCE – New SS Riverside South
Ottawa, On
- Closing Date: September 18, 2025, 02:00PM
- Architect: GRC
- How to Close: estimating@frecon.ca
- Addendums: 5
Project Description
The project consist of construction of a new 67,500 sq.ft. secondary school, located at 576 Borbridge Street, Ottawa.
Please refer to Appendix B and Appendix C to submit with you quote.
Schedule
Start date of construction: October 1st, 2025
Full Occupancy for the work shall occur by July 16th, 2027.
Trades
- Division 01 - General Conditions
- General Conditions
- Division 03 - Concrete
- Concrete Finishing
- Concrete Forming & Accessories
- Concrete Reinforcing
- Division 04 - Masonry
- Masonry
- Division 05 - Metals
- Stainless Fabrications
- Structural Steel
- Division 06 - Wood, Plastics, Composites
- Architectural Woodwork
- Division 07 - Thermal & Moisture Protection
- Aluminum Panels
- Dampproofing & Waterproofing
- Fire Proofing
- Membrane Roofing
- Metal Siding & Roofing
- Roof Anchors
- Spray on Insulation
- Division 08 - Openings
- Aluminum Windows, Curtain Wall, Entrances
- Doors and Frames
- Operators
- Rolling Shutter
- Wood Doors
- Division 09 - Finishes
- Drywall
- Epoxy
- Flooring
- Painting & Wallcoverings
- Division 10 - Specialties
- Chalk & Tack
- Lockers
- Stage Drapery
- Toilet Partitions
- WA
- Division 11 - Equipment
- Athletic Equipment
- Kitchen Equipment
- Division 12 - Furnishings
- Window Blinds
- Division 14 - Conveying Equipment
- Elevators
- Division 21 - Fire Suppression
- Fire Suppression
- Division 22 - Plumbing
- Plumbing
- Division 23 - HVAC
- HVAC
- Division 26 - Electrical
- Electrical
- Division 27 - Comms
- Comms
- Division 31 - Earthwork
- Earthwork
- Division 32 - Exterior Improvments
- Fencing
- Landscaping
- Paving & Curbs
- Division 33 - Utilities
- Utilities