CEPEO – New Leitrim ES School
Orleans, On
- Closing Date: September 04, 2025, 02:00PM
- Architect: Architecture 49
- How to Close: estimating@frecon.ca
- Addendums: 7
Project Description
Construction of a new 3415 sq.m elementary school. Building to be founded on piles with a steel shell frame. Facade is a combination of curtain walls, brick, aluminum and metal siding.
Please send all questions in writing to estimating@frecon.ca
Trades
- Division 03 - Concrete
- Concrete Finishing
- Concrete Forming & Accessories
- Concrete Reinforcing
- Division 04 - Masonry
- Masonry
- Division 05 - Metals
- Metal Fabrications
- Stainless Fabrications
- Structural Steel
- Division 06 - Wood, Plastics, Composites
- Architectural Woodwork
- Division 07 - Thermal & Moisture Protection
- Aluminum Panels
- Caulking
- Dampproofing & Waterproofing
- Fire Proofing
- Fire stopping
- Membrane Roofing
- Metal Siding & Roofing
- Spray on Insulation
- Division 08 - Openings
- Aluminum Windows, Curtain Wall, Entrances
- Doors and Frames
- Hardware
- Operators
- Overhead Doors
- Rolling Shutter
- Wood Doors
- Division 09 - Finishes
- Drywall
- Epoxy
- Flooring
- Painting & Wallcoverings
- Terrazzo
- Division 10 - Specialties
- Chalk & Tack
- Folding Partition
- Signs
- Stage Drapery
- Toilet Partitions
- WA
- Window Film
- Division 12 - Furnishings
- Roller Shades
- Division 14 - Conveying Equipment
- Elevators
- Division 21 - Fire Suppression
- Fire Suppression
- Division 22 - Plumbing
- Plumbing
- Division 23 - HVAC
- HVAC
- Division 26 - Electrical
- Electrical
- Division 27 - Comms
- Comms
- Division 31 - Earthwork
- Earthwork
- Piles
- Division 32 - Exterior Improvments
- Fencing
- Landscaping
- Paving & Curbs
- Site Furnishings
- Division 33 - Utilities
- Utilities