City of Ottawa – Larry Robinson Arena Expansion
2785 8th Line Road, Metcalfe ON
- Closing Date: July 23, 2026, 03:00PM
- Architect: N45
- How to Close: estimating@frecon.ca
Project Description
The project consists of a 721m2 addition to the Larry Robinson Arena to add new changerooms and convert the old changerooms to public washrooms. The project includes the installation of a new septic system.
*THE OWNER HAS PREQUALIFIED THE FOLLOWING TRADES: CIVIL, LANDSCAPING, MASONRY AND MECHANICAL.
Schedule:
Substantial Completion: September 10, 2027
Trades
- Division 01 - General Conditions
- General Conditions
- Division 02 - Exisiting Conditions
- Demolition
- Division 03 - Concrete
- Concrete Finishing
- Concrete Forming & Accessories
- Concrete Reinforcing
- Division 04 - Masonry
- Masonry
- Division 05 - Metals
- Metal Fabrications
- Structural Steel
- Division 06 - Wood, Plastics, Composites
- Architectural Woodwork
- Division 07 - Thermal & Moisture Protection
- Aluminum Panels
- Dampproofing & Waterproofing
- Fire Proofing
- Membrane Roofing
- Metal Siding & Roofing
- Division 08 - Openings
- Aluminum Windows, Curtain Wall, Entrances
- Doors and Frames
- Division 09 - Finishes
- Drywall
- Flooring
- Painting & Wallcoverings
- Division 10 - Specialties
- Arena Dasher Boards
- Lockers
- Signs
- Toilet Partitions
- WA
- Division 14 - Conveying Equipment
- Elevators
- Division 22 - Plumbing
- Plumbing
- Division 23 - HVAC
- HVAC
- Division 26 - Electrical
- Electrical
- Division 31 - Earthwork
- Earthwork
- Division 32 - Exterior Improvments
- Landscaping