City of Ottawa – Larry Robinson Arena Expansion

2785 8th Line Road, Metcalfe ON

  • Closing Date: July 23, 2026, 03:00PM
  • Architect: N45
  • How to Close: estimating@frecon.ca

Project Description

The project consists of a 721m2 addition to the Larry Robinson Arena to add new changerooms and convert the old changerooms to public washrooms. The project includes the installation of a new septic system.

*THE OWNER HAS PREQUALIFIED THE FOLLOWING TRADES: CIVIL, LANDSCAPING, MASONRY AND MECHANICAL.

Schedule:

Substantial Completion: September 10, 2027

Trades

    • Division 01 - General Conditions
      • General Conditions
    • Division 02 - Exisiting Conditions
      • Demolition
    • Division 03 - Concrete
      • Concrete Finishing
      • Concrete Forming & Accessories
      • Concrete Reinforcing
    • Division 04 - Masonry
      • Masonry
    • Division 05 - Metals
      • Metal Fabrications
      • Structural Steel
    • Division 06 - Wood, Plastics, Composites
      • Architectural Woodwork
    • Division 07 - Thermal & Moisture Protection
      • Aluminum Panels
      • Dampproofing & Waterproofing
      • Fire Proofing
      • Membrane Roofing
      • Metal Siding & Roofing
    • Division 08 - Openings
      • Aluminum Windows, Curtain Wall, Entrances
      • Doors and Frames
    • Division 09 - Finishes
      • Drywall
      • Flooring
      • Painting & Wallcoverings
    • Division 10 - Specialties
      • Arena Dasher Boards
      • Lockers
      • Signs
      • Toilet Partitions
      • WA
    • Division 14 - Conveying Equipment
      • Elevators
    • Division 22 - Plumbing
      • Plumbing
    • Division 23 - HVAC
      • HVAC
    • Division 26 - Electrical
      • Electrical
    • Division 31 - Earthwork
      • Earthwork
    • Division 32 - Exterior Improvments
      • Landscaping