DCC – R13 Elevator Replacement, Barrier Free Entrance and Life Safety Upgrades

To be announced

  • Closing Date: November 12, 2026, 02:00PM
  • Architect: To be announced
  • How to Close: To be announced
  • Addendums: 2

Project Description

The project involves elevator replacement, barrier-free accessibility improvements and life safety upgrades at Building R13, Massey Hall, at the Royal Military College in Kingston, Ontario. Work includes selective demolition, structural modifications, entrance and ramp improvements, associated architectural finishes, and mechanical and electrical upgrades. Construction will be coordinated in phases to accommodate continued building use while improving accessibility and fire safety.

Please send questions to estimating@frecon.ca

Trades

    • Division 01 - General Conditions
      • General Conditions
    • Division 02 - Exisiting Conditions
      • Demolition
      • Hazardous Material Removal
    • Division 03 - Concrete
      • Concrete Finishing
      • Concrete Forming & Accessories
      • Concrete Reinforcing
    • Division 04 - Masonry
      • Masonry
    • Division 05 - Metals
      • Structural Steel
    • Division 07 - Thermal & Moisture Protection
      • Dampproofing & Waterproofing
      • Fire Proofing
      • Membrane Roofing
      • Metal Siding & Roofing
    • Division 08 - Openings
      • Aluminum Windows, Curtain Wall, Entrances
      • Doors and Frames
      • Wood Doors
    • Division 09 - Finishes
      • Drywall
      • Flooring
      • Painting & Wallcoverings
      • Terrazzo
    • Division 14 - Conveying Equipment
      • Elevators
    • Division 22 - Plumbing
      • Plumbing
    • Division 23 - HVAC
      • HVAC
    • Division 26 - Electrical
      • Electrical
    • Division 31 - Earthwork
      • Earthwork