RCDSB – Opeongo High School Washroom Renovation

Douglas, ON

  • Closing Date: June 29, 2026, 02:00PM
  • Architect: Hobin Architecture
  • How to Close: Please email all quotes or questions to: estimating@frecon.ca

Project Description

Scope Of Work:

This project involves the demolition of the Girls Washroom 1007, Pipechase 1008A and Boys Washroom 1008 to create a Unisex Washroom open to the Corridor with full height privacy toilet partitions. Additionally, there will be a small exhaust-vent to tie into the existing roof system.

 

Location:

1990 Cobden Road, Douglas, Ontario K0J 1S0

 

Scheduled Dates:

Start Date: June 29, 2026

Completion Date: August 21, 2026

 

Trades

    • Division 01 - General Conditions
      • General Conditions
    • Division 02 - Exisiting Conditions
      • Demolition
      • Hazardous Material Removal
    • Division 03 - Concrete
      • Concrete Finishing
      • Concrete Reinforcing
    • Division 04 - Masonry
      • Masonry
    • Division 05 - Metals
      • Metal Fabrications
      • Structural Steel
    • Division 06 - Wood, Plastics, Composites
      • Architectural Woodwork
    • Division 07 - Thermal & Moisture Protection
      • Membrane Roofing
    • Division 09 - Finishes
      • Drywall
      • Flooring
      • Painting & Wallcoverings
    • Division 10 - Specialties
      • Toilet Partitions
      • WA
    • Division 22 - Plumbing
      • Plumbing
    • Division 23 - HVAC
      • HVAC
    • Division 26 - Electrical
      • Electrical